Case Study
Northampton Regional Service Centre is a 250,000ft2 warehouse owned by Coca-Cola Enterprises. Although the warehouse is only 16 years old the floor had degraded badly resulting in the need for extensive repairs to be carried out on cracked and uneven floor slabs, slab erosion, worn expansion jointing and floor demarcation painting.
This site operates 24/7 and loads and unloads up to 200 articulated vehicles per day. A positive contactor/client relationship was built ensuring the work was completed on time, within the budget and to Coca-Cola’s standards.
John Coburn (Midlands Quality, Safety and Environment Manager), said: “Myself and the operations team at Northampton were extremely impressed with the work completed by PSR Ltd. Delivering a quality flooring finish at a very competitive price are just a few of the criteria we look for when contracting out work; contractors must also have an operational requirements whilst advising on best value for money, preventative maintenance and support. After working with several contractors in the past who have failed to meet our requirements, we are pleased to have finally met a company that can. We look forward to working with PSR Ltd in the future”.
The Problem
![]() |
![]() |
![]() |
The Preparation
![]() |
![]() |
The Result
![]() |
![]() |
![]() |